Subject: | |
From: | |
Reply To: | |
Date: | Fri, 7 Dec 2001 15:20:02 +0100 |
Content-Type: | TEXT/PLAIN |
Parts/Attachments: |
|
|
Minutes of the weekly Beetle and OTIS meeting (BOM) on 29.11, 14:00
Participants:
M. Schmelling, D. Wiedner, S. Loechner, H. Deppe, U. Stange, D.
Baumeister
OTIS:
====
+ DNL
there exist up to now non-consistant figures:
0.47 for an input pulse width of 1.6ns
0.85 3.6ns
this has to be clarified
the biggest perturbation occurs at channel 6/7 and channel
14/15/16 for both pulse widths
further investigations will be done by Harald/Dirk
present work:
Uwe: verilog programming
Harald: layout of DLL/hit registers
Dirk: preparation of straw tube chamber test at HERA-B,
preparation of OTIS tests (derandomizing buffer on
BeetleSR10)
+ to be included in OTIS spec:
- "DataValid" signal
- data format: no data corresponds to logic 0
Beetle:
======
+ LHCb week rehearsal (Daniel)
+ pipeline gain uniformity is still under investigation (Daniel)
+ further noise measurements are under way (Daniel)
+ design work for Beetle1.2 started: new protection diodes at
analog input (Sven)
+ noise measurements on BeetleFE1.1 have to be done/analysed
(Sven)
Daniel
--------------------------------------------------------------
Daniel Baumeister Phone: ++49 6221 544324
MPI fuer Kernphysik Fax : ++49 6221 544345
ASIC laboratory Email: baumeis@
Schroederstr. 90 asic.uni-heidelberg.de
D-69120 Heidelberg
--------------------------------------------------------------
|
|
|